Value
£5 million.
We
contributed our engineering experience in steel and timber frame
construction, together with the sustainable drainage options to
enable cost savings to be adopted amounting to over £100,000
off the steel frame, time saving and Ecco Homes funding by use
of the timber frame and sustainable drainage options.